The Weldia Stadium in Ethiopia finished perfectly
The 4,800 ㎡ compound running track located in beautiful Weldia in Ethiopia was constructed by Guangzhou Disen Sports Equipment Co., Ltd.,has perfectly completed on April 12, 2016.
The materials was shipped at the end of 2014. Due to the delay of the project, construction began in March 2016, and the materials has passed one-year shelf life. Egyptian customers proposed to repurchase a batch of materials. Considering the cost of customers and the non-waste of resources,what’s more is our confidence in Disen materials. After the seriously technical evaluation, we recommended that the customer don’t need to repurchase it. It turns out that Disen material can withstand inspection and guarantee the construction smoothly. MR.FEREDE from Ethiopia sent a thanks email to Disen for our cooperation and support!